HQ2 approaches its 90% completion mark. Inside, the framing and drywall is nearly complete. Floors are epoxied, and the Super Hybrid Geothermal System is installed. The zone heating/cooling, plumbing, and electric is nearly completed. Double-barrier doors and auto-shade window controls are installed. The concrete sidewalks, asphalt parking lot, and courtyard are completed.