Next, HQ2’s interior is foam-insulated. Framework and electric installation begins. Window frames and glass are installed. The rain water cistern is added to the outside of the building. And a key part of HQ2’s Super Hybrid Geothermal HVAC System installation happens: the geothermal boreholes are drilled. The building’s geothermal set-up includes four wells and a Manifest pump system.