HQ2 begins to take shape. The pre–cast concrete walls are erected. This concrete forms the base of the walls, which are constructed with built-in air gaps and foam to insulate the building.
HQ2 begins to take shape. The pre–cast concrete walls are erected. This concrete forms the base of the walls, which are constructed with built-in air gaps and foam to insulate the building.